| Hits ?▲ |
Authors |
Title |
Venue |
Year |
Link |
Author keywords |
| 1 | Wiebke Höhn, Tobias Jacobs, Nicole Megow |
On Eulerian extensions and their application to no-wait flowshop scheduling.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Edmund K. Burke, Michael Pinedo |
Editorial - Journal of Scheduling (2012).  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | É. Naudin, P. Y. C. Chan, Michael Hiroux, T. Zemmouri, Georges Weil |
Analysis of three mathematical models of the Staff Rostering Problem.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Shanling Li, Zhi-Long Chen, Guochun Tang |
Optimality proof of the Kise-Ibaraki-Mine algorithm.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Jeffrey W. Herrmann |
Using aggregation to construct periodic policies for routing jobs to parallel servers with deterministic service times.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Hans L. Bodlaender, Petra Schuurman, Gerhard J. Woeginger |
Scheduling of pipelined operator graphs.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | C. T. Ng, Lingfa Lu |
On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Jiuping Xu, Zhe Zhang |
A fuzzy random resource-constrained scheduling model with multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Ruggero Bellio, Luca Di Gaspero, Andrea Schaerf |
Design and statistical analysis of a hybrid local search algorithm for course timetabling.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Rongjun Chen, Wanzhen Huang, Zhongxian Men, Guochun Tang |
Open-shop dense schedules: properties and worst-case performance ratio.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Joan Boyar, Lene M. Favrholdt |
A new variable-sized bin packing problem.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Leah Epstein, Lene M. Favrholdt, Jens S. Kohrt |
Comparing online algorithms for bin packing problems.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Antoine Jouglet |
Single-machine scheduling with no idle time and release dates to minimize a regular criterion.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Murat Firat, C. A. J. Hurkens |
An improved MIP-based approach for a multi-skill workforce scheduling problem.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Christophe Rapine, Nadia Brauner, Gerd Finke, Vassilissa Lebacque |
Single machine scheduling with small operator-non-availability periods.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Bo Chen, Sinan Gürel |
Efficiency analysis of load balancing games with and without activation costs.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Nguyen Huynh Tuong, Ameur Soukhal, Jean-Charles Billaut |
Single-machine multi-agent scheduling problems with a global objective function.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Shunji Tanaka, Shuji Fujikuma |
A dynamic-programming-based exact algorithm for general single-machine scheduling with machine idle time.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Dmitry A. Ivanov, Boris V. Sokolov |
Dynamic supply chain scheduling.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Elkin Castro, Sanja Petrovic |
Combined mathematical programming and heuristics for a radiotherapy pre-treatment scheduling problem.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Amotz Bar-Noy, Richard E. Ladner, Tami Tamir, Tammy VanDeGrift |
Windows scheduling of arbitrary-length jobs on multiple machines.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Andrei Horbach, Thomas Bartsch, Dirk Briskorn |
Using a SAT-solver to schedule sports leagues.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Tak Wah Lam, Lap-Kei Lee, Isaac Kar-Keung To, Prudence W. H. Wong |
Improved multi-processor scheduling for flow time and energy.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Peter Demeester, Burak Bilgin, Patrick De Causmaecker, Greet Vanden Berghe |
A hyperheuristic approach to examination timetabling problems: benchmarks and a new problem from practice.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Dvir Shabtay, Yaron Bensoussan |
Maximizing the weighted number of just-in-time jobs in several two-machine scheduling systems.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Yiwei Cai, Erhan Kutanoglu, John J. Hasenbein, Joe Qin |
Single-machine scheduling with advanced process control constraints.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Igor Averbakh, Mehmet Baysan |
Semi-online two-level supply chain scheduling problems.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Quentin Lequy, Mathieu Bouchard, Guy Desaulniers, François Soumis, Beyime Tachefine |
Assigning multiple activities to work shifts.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Peihai Liu, Xiwen Lu, Yang Fang |
A best possible deterministic on-line algorithm for minimizing makespan on parallel batch machines.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Svetlana A. Kravchenko, Frank Werner |
Minimizing total tardiness on parallel machines with preemptions.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Rolf Harren, Rob van Stee |
Absolute approximation ratios for packing rectangles into bins.  |
J. Scheduling  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Patrick De Causmaecker, Greet Vanden Berghe |
A categorisation of nurse rostering problems.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Raymond S. K. Kwan |
Case studies of successful train crew scheduling optimisation.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Malte Fliedner, Nils Boysen, Armin Scholl |
On the part inventory model sequencing problem: complexity and Beam Search heuristic.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Francisco Ballestín, Agustín Barrios, Vicente Valls |
An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Svetlana A. Kravchenko, Frank Werner |
Parallel machine problems with equal processing times: a survey.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Sadaf Naseem Jat, Shengxiang Yang |
A hybrid genetic algorithm and tabu search approach for post enrolment course timetabling.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Abdullah Alsheddy, Edward P. K. Tsang |
Empowerment scheduling for a field workforce.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Allison C. B. Guedes, Celso C. Ribeiro |
A heuristic for minimizing weighted carry-over effects in round robin tournaments.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Philippe Chrétienne, Öncü Hazir, Safia Kedad-Sidhoum |
Integrated batch sizing and scheduling on a single machine.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Boris Detienne, Stéphane Dauzère-Pérès, Claude Yugma |
Scheduling jobs on parallel machines to minimize a regular step total cost function.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Kazuki Matsumoto, Shunji Umetani, Hiroshi Nagamochi |
On the one-dimensional stock cutting problem in the paper tube industry.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Kenneth R. Baker, Dan Trietsch |
Three heuristic procedures for the stochastic, two-machine flow shop problem.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Abir Benabid, Claire Hanen |
Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delays.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Gilles Simonin, Benoît Darties, Rodolphe Giroudeau, Jean-Claude König |
Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Alessandro Agnetis, Marta Flamini, Gaia Nicosia, Andrea Pacifici |
A job-shop problem with one additional resource type.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Alix Munier Kordon |
A graph-based analysis of the cyclic scheduling problem with time constraints: schedulability and periodicity of the earliest schedule.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Behzad Ashtiani, Roel Leus, Mir-Bahador Aryanezhad |
New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Kangbok Lee, Joseph Y.-T. Leung, Michael L. Pinedo |
Scheduling jobs with equal processing times subject to machine eligibility constraints.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Marta Mesquita, Margarida Moz, Ana Paias, José Paixão, Margarida Vaz Pato, Ana Respício |
A new model for the integrated vehicle-crew-rostering problem and a computational study on rosters.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Jacek Blazewicz, Maciej Drozdowski, Graham Kendall, Barry McCollum |
Preface.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Imed Kacem, Hans Kellerer |
Fast approximation algorithms to minimize a special weighted flow-time criterion on a single machine with a non-availability interval and release dates.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Marvin Mandelbaum, Dvir Shabtay |
Scheduling unit length jobs on parallel machines with lookahead information.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Dvir Shabtay, George Steiner |
A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Armin Fügenschuh |
A set partitioning reformulation of a school bus scheduling problem.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Marek Mika, Grzegorz Waligóra, Jan Weglarz |
Modelling and solving grid resource allocation problem with network resources for workflow applications.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Peter Brucker, Natalia V. Shakhlevich |
A polynomial-time algorithm for a flow-shop batching problem with equal-length operations.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Alistair R. Clark, Reinaldo Morabito, Eli A. V. Toso |
Erratum to: Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Jeffrey W. Herrmann |
Using aggregation to reduce response time variability in cyclic fair sequences.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Michael Gatto, Peter Widmayer |
On robust online scheduling algorithms.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Hassene Aissi, Mohamed Ali Aloulou, Mikhail Y. Kovalyov |
Minimizing the number of late jobs on a single machine under due date uncertainty.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Ivan Heckman, J. Christopher Beck |
Understanding the behavior of Solution-Guided Search for job-shop scheduling.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Leandro Magatão, Lucia V. R. Arruda, Flávio Neves Jr. |
A combined CLP-MILP approach for scheduling commodities in a pipeline.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Xiaoqiang Cai, Xianyi Wu, Xian Zhou |
Scheduling deteriorating jobs on a single machine subject to breakdowns.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Vladimir Kats, Eugene Levner |
Parametric algorithms for 2-cyclic robot scheduling with interval processing times.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Jason A. D. Atkin, Edmund K. Burke, John S. Greenwood |
A comparison of two methods for reducing take-off delay at London Heathrow airport.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Lars Mönch, John W. Fowler, Stéphane Dauzère-Pérès, Scott J. Mason, Oliver Rose |
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Thorsten Gather, Jürgen Zimmermann, Jan-Hendrik Bartels |
Exact methods for the resource levelling problem.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Jinjiang Yuan, Ruyan Fu, C. T. Ng, T. C. Edwin Cheng |
A best online algorithm for unbounded parallel-batch scheduling with restarts to minimize makespan.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Boris Detienne, Stéphane Dauzère-Pérès, Claude Yugma |
Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Donatas Elvikis, Horst W. Hamacher, Vincent T'Kindt |
Scheduling two agents on uniform parallel machines with makespan and cost functions.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Trung Hieu Tran, Kien Ming Ng |
A water-flow algorithm for flexible flow shop scheduling with intermediate buffers.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Sara Ceschia, Luca Di Gaspero, Andrea Schaerf |
Tabu search techniques for the heterogeneous vehicle routing problem with time windows and carrier-dependent costs.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Uwe Schwiegelshohn |
A system-centric metric for the evaluation of online job schedules.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Hana Rudová, Tomás Müller, Keith S. Murray |
Complex university course timetabling.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | António Aroso Menezes, Alistair Clark, Bernardo Almada-Lobo |
Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Jacek Blazewicz, Valter Boljuncic, Silvano Martello, Jadranka Skorin-Kapov |
Combinatorial optimization issues in scheduling.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Peter Brucker, Natalia V. Shakhlevich |
Inverse scheduling: two-machine flow-shop problem.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Antoine Musitelli, Jean-Marc Nicoletti |
Competitive ratio of List Scheduling on uniform machines and randomized heuristics.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Stefan Bock, Michael Pinedo |
A decomposition scheme for single stage scheduling problems.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Geraldo Robson Mateus, Martín Gómez Ravetti, Maurício C. de Souza, Taís M. Valeriano |
Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Débora P. Ronconi, Warren B. Powell |
Minimizing total tardiness in a stochastic single machine scheduling problem using approximate dynamic programming.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Luis A. Castillo, Lluvia Morales, Arturo González-Ferrer, Juan Fernández-Olivares, Daniel Borrajo, Eva Onaindia |
Automatic generation of temporal planning domains for e-learning problems.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Roman van der Krogt, John Geraghty, Mustafa Ramzi Salman, James Little |
On supporting Lean methodologies using constraint-based scheduling.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Michael Bender, Jacek Blazewicz, Erwin Pesch, Denis Trystram, Guochuan Zhang |
Guest editorial - Special issue "New challenges in scheduling theory" (Marseilles Workshop, May 12-16, 2008).  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Edmund K. Burke, Michael Pinedo, Steef L. van de Velde |
Editorial.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Jinwen Ou, Xiangtong Qi, Chung-Yee Lee |
Parallel machine scheduling with multiple unloading servers.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Monia Rekik, Jean-François Cordeau, François Soumis |
Implicit shift scheduling with multiple breaks and work stretch duration restrictions.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Alistair R. Clark, Reinaldo Morabito, Eli A. V. Toso |
Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Michele Lombardi, Michela Milano, Martino Ruggiero, Luca Benini |
Stochastic allocation and scheduling for conditional task graphs in multi-processor systems-on-chip.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Roman Barták, Hana Rudová |
Special issue on applications and methodologies for planning and scheduling: editorial.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Alexander V. Kononov, Bertrand M. T. Lin |
Minimizing the total weighted completion time in the relocation problem.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Dehua Xu, Yunqiang Yin, Hongxing Li |
Scheduling jobs under increasing linear machine maintenance time.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Yossi Borenstein, Nazaraf Shah, Edward P. K. Tsang, Raphaël Dorne, Abdullah Alsheddy, Christos Voudouris |
On the partitioning of dynamic workforce scheduling problems.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Yury Nikulin, Andreas Drexl |
Theoretical aspects of multicriteria flight gate scheduling: deterministic and fuzzy models.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Yves Crama, Hakan Gultekin |
Throughput optimization in two-machine flowshops with flexible operations.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | M. Selim Aktürk, Alper Atamtürk, Sinan Gürel |
Parallel machine match-up scheduling with manufacturing cost considerations.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Jean-François Cordeau, Gilbert Laporte, Federico Pasin, Stefan Ropke |
Scheduling technicians and tasks in a telecommunications company.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Shengxiang Yang, Dingwei Wang, Tianyou Chai, Graham Kendall |
An improved constraint satisfaction adaptive neural network for job-shop scheduling.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Jaehwan Yang, Marc E. Posner |
Flow shops with WIP and value added costs.  |
J. Scheduling  |
2010 |
DBLP DOI BibTeX RDF |
|