| Hits ?▲ |
Authors |
Title |
Venue |
Year |
Link |
Author keywords |
| 3 | Fouad Ben Abdelaziz, Saoussen Krichen, Olfa Dridi |
A Multiobjective Resource-Constrained Project-Scheduling Problem.  |
ECSQARU  |
2007 |
DBLP DOI BibTeX RDF |
Resource-Constrained Project-Scheduling problem, multiobjective optimization, Ant System |
| 3 | Mireille Palpant, Christian Artigues, Philippe Michelon |
LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search.  |
Annals OR  |
2004 |
DBLP DOI BibTeX RDF |
resource-constrained project scheduling problem, large neighbourhood search |
| 3 | Ioannis E. Diakoulakis, Dimitris E. Koulouriotis, Dimitris M. Emiris |
Resource Constrained Project Scheduling using evolution strategies.  |
Operational Research  |
2004 |
DBLP DOI BibTeX RDF |
Metaheuristics, Evolution Strategies, Resource Constrained Project Scheduling |
| 3 | María Pilar Tormos, Antonio Luis Lova |
A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling.  |
Annals OR  |
2001 |
DBLP DOI BibTeX RDF |
backward-forward, project management, random sampling, resource-constrained project scheduling |
| 2 | M. D. Mahdi Mobini, Masoud Rabbani, M. S. Amalnik, J. Razmi, A. R. Rahimi-Vahed |
Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem.  |
Soft Comput.  |
2009 |
DBLP DOI BibTeX RDF |
Resource constrained, Scatter search algorithm, Makespan, Project scheduling, Path relinking |
| 2 | Arif Volkan Vural, Burak Eksioglu |
Static Resource Constrained Project Scheduling.  |
Encyclopedia of Optimization  |
2009 |
DBLP DOI BibTeX RDF |
Scheduling, Resource scheduling, Project scheduling, Resource constrained project scheduling |
| 2 | Vincent Van Peteghem, Mario Vanhoucke |
An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem.  |
EvoCOP  |
2009 |
DBLP DOI BibTeX RDF |
|
| 2 | André Renato Villela da Silva, Luiz Satoru Ochi |
New sequential and parallel algorithm for Dynamic Resource Constrained Project Scheduling Problem.  |
IPDPS  |
2009 |
DBLP DOI BibTeX RDF |
|
| 2 | Christian Artigues, Cyril Briand |
The resource-constrained activity insertion problem with minimum and maximum time lags.  |
J. Scheduling  |
2009 |
DBLP DOI BibTeX RDF |
Minimum and maximum time lags, Activity insertion problem, Complexity, Resource-constrained project scheduling |
| 2 | Majid Sabzehparvar, S. Mohammad Seyed-Hosseini |
A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags.  |
The Journal of Supercomputing  |
2008 |
DBLP DOI BibTeX RDF |
Resource constrained, Rectangle packing, Time windows, Time lags, Multi-mode |
| 2 | Olivier Lambrechts, Erik Demeulemeester, Willy Herroelen |
Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities.  |
J. Scheduling  |
2008 |
DBLP DOI BibTeX RDF |
Proactive/reactive project scheduling, Stochastic resource breakdowns |
| 2 | Olivier Liess, Philippe Michelon |
A constraint programming approach for the resource-constrained project scheduling problem.  |
Annals OR  |
2008 |
DBLP DOI BibTeX RDF |
|
| 2 | Mariamar Cervantes, Antonio Luis Lova, María Pilar Tormos, Federico Barber |
A Dynamic Population Steady-State Genetic Algorithm for the Resource-Constrained Project Scheduling Problem.  |
IEA/AIE  |
2008 |
DBLP DOI BibTeX RDF |
genetic algorithm, resource constraints, project scheduling |
| 2 | Wanan Cui, Shengbao Yao, Xiuning Cao |
Critical Sequence Optimization under Adjustable Resource-Constrained Project Scheduling.  |
CSSE  |
2008 |
DBLP DOI BibTeX RDF |
|
| 2 | J. M. van den Akker, Guido Diepen, J. A. Hoogeveen |
A Column Generation Based Destructive Lower Bound for Resource Constrained Project Scheduling Problems.  |
CPAIOR  |
2007 |
DBLP DOI BibTeX RDF |
Mathematics Subject Classification (Revision 1991) 90B35 |
| 2 | Igor Pesek, Andrea Schaerf, Janez Zerovnik |
Hybrid Local Search Techniques for the Resource-Constrained Project Scheduling Problem.  |
Hybrid Metaheuristics  |
2007 |
DBLP DOI BibTeX RDF |
|
| 2 | Xiang Li, Lishan Kang, Wei Tan 0003 |
Optimized Research of Resource Constrained Project Scheduling Problem Based on Genetic Algorithms.  |
ISICA  |
2007 |
DBLP DOI BibTeX RDF |
Network planning Optimization, Genetic Algorithms, Multi-task |
| 2 | Jin-Lee Kim |
Permutation-based elitist genetic algorithm using serial scheme for large-sized resource-constrained project scheduling.  |
Winter Simulation Conference  |
2007 |
DBLP DOI BibTeX RDF |
|
| 2 | Ningxiong Xu, Linda K. Nozick, Orr Bernstein, Dean A. Jones |
Stochastic rollout and justification to solve the resource-constrained project scheduling problem.  |
Winter Simulation Conference  |
2007 |
DBLP DOI BibTeX RDF |
|
| 2 | Celso Tchao, Simone L. Martins |
Hybrid Heuristics for Multi-mode Resource-Constrained Project Scheduling.  |
LION  |
2007 |
DBLP DOI BibTeX RDF |
|
| 2 | Rema Padman, Dan Zhu |
Knowledge integration using problem spaces: A study in resource-constrained project scheduling.  |
J. Scheduling  |
2006 |
DBLP DOI BibTeX RDF |
Constrained project scheduling, Neural networks, Heuristics, Knowledge integration |
| 2 | Jürgen Kuster, Dietmar Jannach |
Handling Airport Ground Processes Based on Resource-Constrained Project Scheduling.  |
IEA/AIE  |
2006 |
DBLP DOI BibTeX RDF |
|
| 2 | Zhenyuan Liu, Hongwei Wang |
GA-Based Resource-Constrained Project Scheduling with the Objective of Minimizing Activities' Cost.  |
ICIC  |
2005 |
DBLP DOI BibTeX RDF |
|
| 2 | Yongyi Shou |
A Neural Network Based Heuristic for Resource-Constrained Project Scheduling.  |
ISNN  |
2005 |
DBLP DOI BibTeX RDF |
|
| 2 | Dieter Debels, Mario Vanhoucke |
The Electromagnetism Meta-heuristic Applied to the Resource-Constrained Project Scheduling Problem.  |
Artificial Evolution  |
2005 |
DBLP DOI BibTeX RDF |
|
| 2 | Hong Wang, Dan Lin 0002, Minqiang Li |
A Genetic Algorithm for Solving Fuzzy Resource-Constrained Project Scheduling.  |
ICNC  |
2005 |
DBLP DOI BibTeX RDF |
|
| 2 | Hong Wang, Dan Lin 0002, Minqiang Li |
A Genetic Algorithm for Solving Resource-Constrained Project Scheduling Problem.  |
ICNC  |
2005 |
DBLP DOI BibTeX RDF |
|
| 2 | Dieter Debels, Mario Vanhoucke |
A Bi-population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem.  |
ICCSA  |
2005 |
DBLP DOI BibTeX RDF |
|
| 2 | Vicente Valls, Francisco Ballestín, Sacramento Quintanilla |
A Population-Based Approach to the Resource-Constrained Project Scheduling Problem.  |
Annals OR  |
2004 |
DBLP DOI BibTeX RDF |
population-based algorithms, scatter search, path relinking, resource constrained project scheduling, hybrid heuristics |
| 2 | Shipeng Luo, Cheng Wang, Jinwen Wang |
Ant Colony Optimization for Resource-Constrained Project Scheduling with Generalized Precedence Relations.  |
ICTAI  |
2003 |
DBLP DOI BibTeX RDF |
|
| 2 | Gündüz Ulusoy, Funda Sivrikaya-Serifoglu, Sule Önsel Sahin |
Four Payment Models for the Multi-Mode Resource Constrained Project Scheduling Problem with Discounted Cash Flows.  |
Annals OR  |
2001 |
DBLP DOI BibTeX RDF |
discounted cash flow, payment models, resource constraints, project scheduling |
| 2 | Joanna Józefowska, Marek Mika, Rafal Rózycki, Grzegorz Waligóra, Jan Weglarz |
Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling.  |
Annals OR  |
2001 |
DBLP DOI BibTeX RDF |
multi-mode project scheduling, renewable resources, non-renewable resources, simulated annealing |
| 2 | Javier Alcaraz, Concepción Maroto |
A Robust Genetic Algorithm for Resource Allocation in Project Scheduling.  |
Annals OR  |
2001 |
DBLP DOI BibTeX RDF |
heuristic and metaheuristic techniques, genetic algorithms, project management, resource-constrained project scheduling, computational experiment |
| 2 | Alf Kimms |
Maximizing the Net Present Value of a Project Under Resource Constraints Using a Lagrangian Relaxation Based Heuristic with Tight Upper Bounds.  |
Annals OR  |
2001 |
DBLP DOI BibTeX RDF |
heuristics, Lagrangian relaxation, resource-constrained project scheduling, net present value |
| 2 | Mario Vanhoucke, Erik Demeulemeester, Willy Herroelen |
An Exact Procedure for the Resource-Constrained Weighted Earliness-Tardiness Project Scheduling Problem.  |
Annals OR  |
2001 |
DBLP DOI BibTeX RDF |
weighted earliness-tardinesss costs, branch-and-bound, resource-constrained project scheduling |
| 2 | Rolf H. Möhring, Andreas S. Schulz, Frederik Stork, Marc Uetz |
Resource-Constrained Project Scheduling: Computing Lower Bounds by Solving Minimum Cut Problems.  |
ESA  |
1999 |
DBLP DOI BibTeX RDF |
|
| 1 | Ling Wang, Chen Fang |
A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem.  |
Expert Syst. Appl.  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Oumar Koné |
New approaches for solving the resource-constrained project scheduling problem.  |
4OR  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Thomas S. Kyriakidis, Georgios M. Kopanos, Michael C. Georgiadis |
MILP formulations for single- and multi-mode resource-constrained project scheduling problems.  |
Computers & Chemical Engineering  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Mohammad Ranjbar, Mohammad Khalilzadeh, Fereydoon Kianfar, Kobra Etminani |
An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problem.  |
Computers & Industrial Engineering  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Chen Fang, Ling Wang |
An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem.  |
Computers & OR  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Ling Wang, Chen Fang |
An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem.  |
Computers & OR  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Mohamed Haouari, Anis Kooli, Emmanuel Néron |
Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem.  |
Computers & OR  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Michele Lombardi, Michela Milano |
A min-flow algorithm for Minimal Critical Set detection in Resource Constrained Project Scheduling.  |
Artif. Intell.  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Andreas Schutt, Geoffrey Chu, Peter J. Stuckey, Mark G. Wallace |
Maximising the Net Present Value for Resource-Constrained Project Scheduling.  |
CPAIOR  |
2012 |
DBLP DOI BibTeX RDF |
|
| 1 | Koorush Ziarati, Reza Akbari, Vahid Zeighami |
On the performance of bee algorithms for resource-constrained project scheduling problem.  |
Appl. Soft Comput.  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Ruey-Maw Chen |
Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem.  |
Expert Syst. Appl.  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Shanshan Wu, Hung-Da Wan, Sanjay Kumar Shukla, Beizhi Li |
Chaos-based improved immune algorithm (CBIIA) for resource-constrained project scheduling problems.  |
Expert Syst. Appl.  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Filip Deblaere, Erik Demeulemeester, Willy Herroelen |
Proactive policies for the stochastic resource-constrained project scheduling problem.  |
European Journal of Operational Research  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | José Coelho, Mario Vanhoucke |
Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers.  |
European Journal of Operational Research  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Ling Wang, Chen Fang |
An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem.  |
Inf. Sci.  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Francisco Ballestín, Agustín Barrios, Vicente Valls |
An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Behzad Ashtiani, Roel Leus, Mir-Bahador Aryanezhad |
New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing.  |
J. Scheduling  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | José Fernando Gonçalves, Mauricio G. C. Resende, Jorge José de Magalhães Mendes |
A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem.  |
J. Heuristics  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Vincent Van Peteghem, Mario Vanhoucke |
Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem.  |
J. Heuristics  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Chunfeng Liu, Shanlin Yang |
A Serial Insertion Schedule Generation Scheme for Resource-constrained Project Scheduling.  |
JCP  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Maria Elena Bruni, Patrizia Beraldi, Francesca Guerriero, Erika Pinto |
A heuristic approach for resource constrained project scheduling with uncertain activity durations.  |
Computers & OR  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Francisco Ballestín, Rosa Blanco |
Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems.  |
Computers & OR  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Lucio Bianco, Massimiliano Caramia |
A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations.  |
Computers & OR  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Anurag Agarwal, Selcuk Colak, S. Selçuk Erengüç |
A Neurogenetic approach for the resource-constrained project scheduling problem.  |
Computers & OR  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Oumar Koné, Christian Artigues, Pierre Lopez, Marcel Mongeau |
Event-based MILP models for resource-constrained project scheduling problems.  |
Computers & OR  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Amin Tahooneh, Koorush Ziarati |
Using Artificial Bee Colony to Solve Stochastic Resource Constrained Project Scheduling Problem.  |
ICSI  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Ling Wang, Ye Xu, Chen Fang |
A Hybrid Algorithm Based on Simplex Search and Differential Evolution for Resource-Constrained Project Scheduling Problem.  |
ICIC  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Carlos Ansótegui, Miquel Bofill, Miquel Palahí, Josep Suy, Mateu Villaret |
Satisfiability Modulo Theories: An Efficient Approach for the Resource-Constrained Project Scheduling Problem.  |
SARA  |
2011 |
DBLP BibTeX RDF |
|
| 1 | Fang Fu, Chao Zhang |
A Modified Harmony Search for Multi-mode Resource Constrained Project Scheduling Problem.  |
ISCID  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Roel Leus, Christian Artigues, Fabrice Talla Nobibon |
Robust optimization for resource-constrained project scheduling with uncertain activity durations.  |
IEEM  |
2011 |
DBLP DOI BibTeX RDF |
|
| 1 | Anikó Csébfalvi, György Csébfalvi, Sándor Danka |
Fuzzification of the Resource-constrained Project Scheduling Problem - A Fight against Nature.  |
IJCCI (ECTA-FCTA) ![In: ECTA and FCTA 2011 - Proceedings of the International Conference on Evolutionary Computation Theory and Applications and the Proceedings of the International Conference on Fuzzy Computation Theory and Applications [parts of the International Joint Conference on Computational Intelligence IJCCI 2011], Paris, France, 24-26 October, 2011, pp. 286-291, 2011, SciTePress, 978-989-8425-83-6. The full citation details ...](Pics/full.jpeg) |
2011 |
DBLP BibTeX RDF |
|
| 1 | Anis Kooli, Mohamed Haouari, Lotfi Hidri, Emmanuel Néron |
IP-Based Energetic Reasoning for the Resource Constrained Project Scheduling Problem.  |
Electronic Notes in Discrete Mathematics  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Vincent Van Peteghem, Mario Vanhoucke |
A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem.  |
European Journal of Operational Research  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Sönke Hartmann, Dirk Briskorn |
A survey of variants and extensions of the resource-constrained project scheduling problem.  |
European Journal of Operational Research  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Sonda Elloumi, Philippe Fortemps |
A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem.  |
European Journal of Operational Research  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Siamak Baradaran, S. M. T. Fatemi Ghomi, Mahdi Mobini, S. S. Hashemin |
A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks.  |
Advances in Engineering Software  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Wang Chen, Yan-jun Shi, Hong-fei Teng, Xiao-ping Lan, Li-chen Hu |
An efficient hybrid algorithm for resource-constrained project scheduling.  |
Inf. Sci.  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Reza Zamani |
An Accelerating Two-Layer Anchor Search With Application to the Resource-Constrained Project Scheduling Problem.  |
IEEE Trans. Evolutionary Computation  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Andrei Horbach |
A Boolean satisfiability approach to the resource-constrained project scheduling problem.  |
Annals OR  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Angela Hsiang-Ling Chen, Chiuh-Cheng Chyu |
Economic optimization of resource-constrained project scheduling: a two-phase metaheuristic approach.  |
Journal of Zhejiang University - Science C  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Andreas Schutt, Thibaut Feydy, Peter J. Stuckey, Mark G. Wallace |
Solving the Resource Constrained Project Scheduling Problem with Generalized Precedences by Lazy Clause Generation  |
CoRR  |
2010 |
DBLP BibTeX RDF |
|
| 1 | Zhi-Jie Chen, Chiuh-Cheng Chyu |
An Evolutionary Algorithm with Multi-Local Search for the Resource-Constrained Project Scheduling Problem.  |
Intelligent Information Management  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Jie Zhu, Xiaoping Li |
An effective evolutionary algorithm for Pre-emptive Resource-Constrained Project Scheduling problems.  |
SMC  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Piotr Jedrzejowicz, Aleksander Skakovski |
A Cross-Entropy Based Population Learning Algorithm for Multi-mode Resource-Constrained Project Scheduling Problem with Minimum and Maximum Time Lags.  |
ICCCI  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Konstantinos P. Anagnostopoulos, Georgios K. Koulinas |
A genetic hyperheuristic algorithm for the resource constrained project scheduling problem.  |
IEEE Congress on Evolutionary Computation  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Yan-jun Shi, Fu-Zhen Qu, Wang Chen, Bo Li |
An Artificial Bee Colony with Random Key for Resource-Constrained Project Scheduling.  |
LSMS/ICSEE  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Xiaoying Pan, Hao Chen |
A Multi-agent Social Evolutionary Algorithm for Resource-Constrained Project Scheduling.  |
CIS  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Timo Berthold, Stefan Heinz, Marco E. Lübbecke, Rolf H. Möhring, Jens Schulz |
A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling.  |
CPAIOR  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | André Renato Villela da Silva, Luiz Satoru Ochi |
Hybrid Heuristics for Dynamic Resource-Constrained Project Scheduling Problem.  |
Hybrid Metaheuristics  |
2010 |
DBLP DOI BibTeX RDF |
|
| 1 | Khaled Moumene, Jacques A. Ferland |
Activity list representation for a generalization of the resource-constrained project scheduling problem.  |
European Journal of Operational Research  |
2009 |
DBLP DOI BibTeX RDF |
|
| 1 | Cyril Briand |
A new any-order schedule generation scheme for resource-constrained project scheduling.  |
RAIRO - Operations Research  |
2009 |
DBLP DOI BibTeX RDF |
|
| 1 | Lin Yu Tseng, Shih-Chieh Chen |
Two-Phase Genetic Local Search Algorithm for the Multimode Resource-Constrained Project Scheduling Problem.  |
IEEE Trans. Evolutionary Computation  |
2009 |
DBLP DOI BibTeX RDF |
|
| 1 | Jorge José de Magalhães Mendes, José Fernando Gonçalves, Mauricio G. C. Resende |
A random key based genetic algorithm for the resource constrained project scheduling problem.  |
Computers & OR  |
2009 |
DBLP DOI BibTeX RDF |
|
| 1 | N. Damak, Bassem Jarboui, Patrick Siarry, Taïcir Loukil |
Differential evolution for solving multi-mode resource-constrained project scheduling problems.  |
Computers & OR  |
2009 |
DBLP DOI BibTeX RDF |
|
| 1 | Ming Li, Yuanbiao Zhang, Weigang Jiang, Jianwen Xie |
A Particle Swarm Optimization Algorithm with Crossover for Resource Constrained Project Scheduling Problem.  |
SSME  |
2009 |
DBLP DOI BibTeX RDF |
|
| 1 | Angelo Oddi, Riccardo Rasconi |
Solving Resource-Constrained Project Scheduling Problems with Time-Windows Using Iterative Improvement Algorithms.  |
ICAPS  |
2009 |
DBLP BibTeX RDF |
|
| 1 | Yongbo Yuan, Kai Wang, Le Ding |
A Solution to Resource-Constrained Project Scheduling Problem: Based on Ant Colony Optimization Algorithm.  |
HIS  |
2009 |
DBLP DOI BibTeX RDF |
Constraint Resource, Ant Colony Optimization, Project Scheduling |
| 1 | Fang Ming Guo, Li Ma, Min He |
Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling.  |
CSO  |
2009 |
DBLP DOI BibTeX RDF |
|
| 1 | Jens Czogalla, Andreas Fink |
Fitness Landscape Analysis for the Resource Constrained Project Scheduling Problem.  |
LION  |
2009 |
DBLP DOI BibTeX RDF |
|
| 1 | Haitao Li, Keith Womer |
Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm.  |
J. Scheduling  |
2009 |
DBLP DOI BibTeX RDF |
Multi-skilled personnel, Hybrid MILP/CP algorithms, Benders decomposition, Resource-constrained project scheduling |
| 1 | Michele Lombardi, Michela Milano |
A Precedence Constraint Posting Approach for the RCPSP with Time Lags and Variable Durations.  |
CP  |
2009 |
DBLP DOI BibTeX RDF |
|
| 1 | Andreas Schutt, Thibaut Feydy, Peter J. Stuckey, Mark Wallace |
Why Cumulative Decomposition Is Not as Bad as It Sounds.  |
CP  |
2009 |
DBLP DOI BibTeX RDF |
|
| 1 | Mario Vanhoucke |
A Genetic Algorithm for Net Present Value Maximization for Resource Constrained Projects.  |
EvoCOP  |
2009 |
DBLP DOI BibTeX RDF |
|
| 1 | Piotr Jedrzejowicz, Ewa Ratajczak-Ropel |
Solving the RCPSP/max Problem by the Team of Agents.  |
KES-AMSTA  |
2009 |
DBLP DOI BibTeX RDF |
|