Hits ?▲ |
Authors |
Title |
Venue |
Year |
Link |
Author keywords |
140 | Dvir Shabtay, George Steiner |
The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times. |
Ann. Oper. Res. |
2008 |
DBLP DOI BibTeX RDF |
Earliness-tardiness scheduling, Resource allocation, Single-machine scheduling, Due date assignment, Controllable processing times |
110 | Francis Sourd, Safia Kedad-Sidhoum |
A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem. |
J. Sched. |
2008 |
DBLP DOI BibTeX RDF |
One-machine scheduling, Earliness-tardiness, Branch-and-bound, Lagrangean relaxation |
94 | Sufen Li, Yunlong Zhu, Xiaoying Li |
Earliness/Tardiness Flow-Shop Scheduling under Uncertainty. |
ICTAI |
2005 |
DBLP DOI BibTeX RDF |
|
64 | Hoksung Yau, Yunpeng Pan, Leyuan Shi |
New Solution Approaches to the General Single- Machine Earliness-Tardiness Problem. |
IEEE Trans Autom. Sci. Eng. |
2008 |
DBLP DOI BibTeX RDF |
|
64 | Rym M'Hallah, Ali Alhajraf |
Ant Colony Optimization for the Single Machine Total Earliness Tardiness Scheduling Problem. |
IEA/AIE |
2008 |
DBLP DOI BibTeX RDF |
earliness, scheduling, heuristics, ant colonies, tardiness |
59 | Matthias Müller-Hannemann, Alexander Sonnikow |
Non-approximability of just-in-time scheduling. |
J. Sched. |
2009 |
DBLP DOI BibTeX RDF |
Earliness, Non-approximability, Special cases, Single machine scheduling, Just-in-time, Tardiness |
59 | Marcin Bazyluk, Leszek Koszalka, Keith J. Burnham |
Scheduling on Networks of Workstations with Task Runtime Restrictions. |
ICN |
2008 |
DBLP DOI BibTeX RDF |
|
59 | Hongluan Zhao, Fasheng Hu, Guojun Li |
Batch Scheduling with a Common Due Window on a Single Machine. |
FSKD |
2006 |
DBLP DOI BibTeX RDF |
Due Window, Earliness, Scheduling, Batch, Tardiness |
50 | Halil Sen, Kerem Bülbül |
A Strong Preemptive Relaxation for Weighted Tardiness and Earliness/Tardiness Problems on Unrelated Parallel Machines. |
INFORMS J. Comput. |
2015 |
DBLP DOI BibTeX RDF |
|
50 | Lars Mönch, Robert Unbehaun, You In Choung |
Minimizing earliness-tardiness on a single burn-in oven with a common due date and maximum allowable tardiness constraint. |
OR Spectr. |
2006 |
DBLP DOI BibTeX RDF |
|
46 | Guang Feng, Hoong Chuin Lau |
Efficient algorithms for machine scheduling problems with earliness and tardiness penalties. |
Ann. Oper. Res. |
2008 |
DBLP DOI BibTeX RDF |
Earliness-tardiness, Squeaky wheel, Scheduling, Meta-heuristics |
35 | Abderrazzak Sabri, Hamid Allaoui, Omar Souissi |
Reinforcement learning and stochastic dynamic programming for jointly scheduling jobs and preventive maintenance on a single machine to minimise earliness-tardiness. |
Int. J. Prod. Res. |
2024 |
DBLP DOI BibTeX RDF |
|
35 | Matan Atsmony, Gur Mosheiov |
Single machine scheduling to minimize maximum earliness/tardiness cost with job rejection. |
Optim. Lett. |
2024 |
DBLP DOI BibTeX RDF |
|
35 | Julian Baals, Simon Emde, Marcel Turkensteen |
Minimizing earliness-tardiness costs in supplier networks - A just-in-time truck routing problem. |
Eur. J. Oper. Res. |
2023 |
DBLP DOI BibTeX RDF |
|
35 | Oguzhan Ahmet Arik, Marco Schutten, Engin Topan |
Weighted earliness/tardiness parallel machine scheduling problem with a common due date. |
Expert Syst. Appl. |
2022 |
DBLP DOI BibTeX RDF |
|
35 | Yu Tian |
Single-Machine Due-Window Assignment Scheduling with Resource Allocation and Generalized Earliness/Tardiness Penalties. |
Asia Pac. J. Oper. Res. |
2022 |
DBLP DOI BibTeX RDF |
|
35 | Wanlei Wang |
Single-machine due-date assignment scheduling with generalized earliness-tardiness penalties including proportional setup times. |
J. Appl. Math. Comput. |
2022 |
DBLP DOI BibTeX RDF |
|
35 | Oguzhan Ahmet Arik |
Single machine earliness/tardiness scheduling problem with grey processing times and the grey common due date. |
Grey Syst. Theory Appl. |
2021 |
DBLP DOI BibTeX RDF |
|
35 | Abderrazzak Sabri, Hamid Allaoui, Omar Souissi |
Stochastic Dynamic Programming for Earliness-Tardiness Single Machine Scheduling with Maintenance Considerations. |
APMS (5) |
2021 |
DBLP DOI BibTeX RDF |
|
35 | Oguzhan Ahmet Arik |
Comparisons of metaheuristic algorithms for unrelated parallel machine weighted earliness/tardiness scheduling problems. |
Evol. Intell. |
2020 |
DBLP DOI BibTeX RDF |
|
35 | Shi-Sheng Li, Ren-Xia Chen |
Scheduling with common due date assignment to minimize generalized weighted earliness-tardiness penalties. |
Optim. Lett. |
2020 |
DBLP DOI BibTeX RDF |
|
35 | Kerem Bülbül, Safia Kedad-Sidhoum, Halil Sen |
Single-machine common due date total earliness/tardiness scheduling with machine unavailability. |
J. Sched. |
2019 |
DBLP DOI BibTeX RDF |
|
35 | Arthur Kramer, Anand Subramanian 0001 |
A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems. |
J. Sched. |
2019 |
DBLP DOI BibTeX RDF |
|
35 | Michael F. Gorman 0001, Daniel G. Conway |
A tutorial of integrating duality and branch and bound in earliness-tardiness scheduling with idle insertion time problems. |
Int. J. Prod. Res. |
2018 |
DBLP DOI BibTeX RDF |
|
35 | Jens Rocholl, Lars Mönch |
Hybrid algorithms for the earliness-tardiness single-machine multiple orders per job scheduling problem with a common due date. |
RAIRO Oper. Res. |
2018 |
DBLP DOI BibTeX RDF |
|
35 | Hadi Mokhtari, Amir Noroozi |
An efficient chaotic based PSO for earliness/tardiness optimization in a batch processing flow shop scheduling problem. |
J. Intell. Manuf. |
2018 |
DBLP DOI BibTeX RDF |
|
35 | Anne-Laure Ladier, Gülgün Alpan |
Crossdock truck scheduling with time windows: earliness, tardiness and storage policies. |
J. Intell. Manuf. |
2018 |
DBLP DOI BibTeX RDF |
|
35 | Bruno Ferreira Rosa, Marcone Jamilson Freitas Souza, Sérgio Ricardo de Souza, Moacir Felizardo de França Filho, Zacharie Alès, Philippe Yves Paul Michelon |
Algorithms for job scheduling problems with distinct time windows and general earliness/tardiness penalties. |
Comput. Oper. Res. |
2017 |
DBLP DOI BibTeX RDF |
|
35 | Eliran Sherzer, Yoav Kerner |
When to arrive at a queue with earliness, tardiness and waiting costs. |
CoRR |
2017 |
DBLP BibTeX RDF |
|
35 | Eliran Sherzer, Yoav Kerner |
When to arrive at a queue with earliness, tardiness and waiting costs. |
Perform. Evaluation |
2017 |
DBLP DOI BibTeX RDF |
|
35 | Enrique Gerstl, Gur Mosheiov |
Minmax weighted earliness-tardiness with identical processing times and two competing agents. |
Comput. Ind. Eng. |
2017 |
DBLP DOI BibTeX RDF |
|
35 | Christos Koulamas |
Common due date assignment with generalized earliness/tardiness penalties. |
Comput. Ind. Eng. |
2017 |
DBLP DOI BibTeX RDF |
|
35 | Jia-Can Geng, Zhe Cui, Xingsheng Gu |
Scatter search based particle swarm optimization algorithm for earliness/tardiness flowshop scheduling with uncertainty. |
Int. J. Autom. Comput. |
2016 |
DBLP DOI BibTeX RDF |
|
35 | Rym M'Hallah, Ali Alhajraf |
Ant colony systems for the single-machine total weighted earliness tardiness scheduling problem. |
J. Sched. |
2016 |
DBLP DOI BibTeX RDF |
|
35 | Ramón Alvarez-Valdés, José Manuel Tamarit, Fulgencia Villa |
Minimizing weighted earliness-tardiness on parallel machines using hybrid metaheuristics. |
Comput. Oper. Res. |
2015 |
DBLP DOI BibTeX RDF |
|
35 | Fardin Ahmadizar, Soma Farhadi |
Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs. |
Comput. Oper. Res. |
2015 |
DBLP DOI BibTeX RDF |
|
35 | Tao Qin, Bo Peng 0010, Una Benlic, T. C. E. Cheng, Yang Wang 0030, Zhipeng Lü |
Iterated local search based on multi-type perturbation for single-machine earliness/tardiness scheduling. |
Comput. Oper. Res. |
2015 |
DBLP DOI BibTeX RDF |
|
35 | Arthur Kramer, Anand Subramanian 0001 |
A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems. |
CoRR |
2015 |
DBLP BibTeX RDF |
|
35 | Zhongya Li, Huaping Chen 0001, Rui Xu 0004, Xueping Li |
Earliness-tardiness minimization on scheduling a batch processing machine with non-identical job sizes. |
Comput. Ind. Eng. |
2015 |
DBLP DOI BibTeX RDF |
|
35 | Christos Koulamas, S. S. Panwalkar |
On the equivalence of single machine earliness/tardiness problems with job rejection. |
Comput. Ind. Eng. |
2015 |
DBLP DOI BibTeX RDF |
|
35 | Yabo Luo, Guangdong Feng, Feng Zhang, Ya Mao, Jingbing Wu |
A reverse constraint satisfying method for earliness/tardiness scheduling problem based on improved genetic algorithm. |
J. Comput. Methods Sci. Eng. |
2015 |
DBLP DOI BibTeX RDF |
|
35 | Hamed Fazlollahtabar, Mohammad Saidi-Mehrabad, Jaydeep Balakrishnan |
Mathematical optimization for earliness/tardiness minimization in a multiple automated guided vehicle manufacturing system via integrated heuristic algorithms. |
Robotics Auton. Syst. |
2015 |
DBLP DOI BibTeX RDF |
|
35 | Srijith Rajeev, Sabu Kurian, Brijesh Paul |
A modified serial scheduling scheme for resource constrained project scheduling weighted earliness tardiness problem. |
Int. J. Inf. Decis. Sci. |
2015 |
DBLP DOI BibTeX RDF |
|
35 | Sergey Polyakovskiy, Rym M'Hallah |
A multi-agent system for the weighted earliness tardiness parallel machine problem. |
Comput. Oper. Res. |
2014 |
DBLP DOI BibTeX RDF |
|
35 | M. Berke Pamay, Kerem Bülbül, Gündüz Ulusoy |
Dynamic Resource Constrained Multi-Project Scheduling Problem with Weighted Earliness/Tardiness Costs. |
Essays in Production, Project Planning and Scheduling |
2014 |
DBLP DOI BibTeX RDF |
|
35 | Le Liu, Hong Zhou 0002 |
Hybridization of harmony search with variable neighborhood search for restrictive single-machine earliness/tardiness problem. |
Inf. Sci. |
2013 |
DBLP DOI BibTeX RDF |
|
35 | Enrique Gerstl, Gur Mosheiov |
Scheduling problems with two competing agents to minimized weighted earliness-tardiness. |
Comput. Oper. Res. |
2013 |
DBLP DOI BibTeX RDF |
|
35 | Yazdan Khoshjahan, Amir Abbas Najafi, Behrouz Afshar-Nadjafi |
Resource constrained project scheduling problem with discounted earliness-tardiness penalties: Mathematical modeling and solving procedure. |
Comput. Ind. Eng. |
2013 |
DBLP DOI BibTeX RDF |
|
35 | Inna G. Drobouchevitch, Jeffrey B. Sidney |
Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs. |
Comput. Oper. Res. |
2012 |
DBLP DOI BibTeX RDF |
|
35 | Maher Rebai, Imed Kacem, Kondo H. Adjallah |
Earliness-tardiness minimization on a single machine to schedule preventive maintenance tasks: metaheuristic and exact methods. |
J. Intell. Manuf. |
2012 |
DBLP DOI BibTeX RDF |
|
35 | Yunqiang Yin, T. C. E. Cheng, Dehua Xu, Chin-Chia Wu |
Common due date assignment and scheduling with a rate-modifying activity to minimize the due date, earliness, tardiness, holding, and batch delivery cost. |
Comput. Ind. Eng. |
2012 |
DBLP DOI BibTeX RDF |
|
35 | Zhonghua Han, Haibo Shi, Feng Qiao, Lei Yue |
Multiple rules decision-based DE solution for the earliness-tardiness case of hybrid flow-shop scheduling problem. |
Int. J. Model. Identif. Control. |
2012 |
DBLP DOI BibTeX RDF |
|
35 | Jinquan Li, Xuehai Yuan, E. Stanley Lee, Dehua Xu |
Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine. |
Comput. Math. Appl. |
2011 |
DBLP DOI BibTeX RDF |
|
35 | Jan Kelbel, Zdenek Hanzálek |
Solving production scheduling with earliness/tardiness penalties by constraint programming. |
J. Intell. Manuf. |
2011 |
DBLP DOI BibTeX RDF |
|
35 | Shih-Hsin Chen, Min-Chih Chen, Pei-Chann Chang, Yuh-Min Chen |
EA/G-GA for Single Machine Scheduling Problems with Earliness/Tardiness Costs. |
Entropy |
2011 |
DBLP DOI BibTeX RDF |
|
35 | Zahra Pourali, Majid Aminnayeri |
A Novel Discrete League Championship Algorithm for Minimizing Earliness/Tardiness Penalties with Distinct Due Dates and Batch Delivery Consideration. |
ICIC (1) |
2011 |
DBLP DOI BibTeX RDF |
|
35 | Hemmak Allaoua, Ibrahim Osmane |
Variable Parameters Lengths Genetic Algorithm for Minimizing Earliness-Tardiness Penalties of Single Machine Scheduling With a Common Due Date. |
Electron. Notes Discret. Math. |
2010 |
DBLP DOI BibTeX RDF |
|
35 | Safia Kedad-Sidhoum, Francis Sourd |
Fast neighborhood search for the single machine earliness-tardiness scheduling problem. |
Comput. Oper. Res. |
2010 |
DBLP DOI BibTeX RDF |
|
35 | Mehmet Duran Toksari, Ertan Güner |
Parallel machine scheduling problem to minimize the earliness/tardiness costs with learning effect and deteriorating jobs. |
J. Intell. Manuf. |
2010 |
DBLP DOI BibTeX RDF |
|
35 | S. M. T. Fatemi Ghomi, Mehdi Iranpoor |
Earliness-tardiness-lost sales dynamic job-shop scheduling. |
Prod. Eng. |
2010 |
DBLP DOI BibTeX RDF |
|
35 | Boris Detienne, Eric Pinson, David Rivreau |
Lagrangian domain reductions for the single machine earliness-tardiness problem with release dates. |
Eur. J. Oper. Res. |
2010 |
DBLP DOI BibTeX RDF |
|
35 | Hans Kellerer, Vitaly A. Strusevich |
Minimizing Total Weighted earliness-tardiness on a Single Machine around a Small Common due date: an FPTAS Using Quadratic Knapsack. |
Int. J. Found. Comput. Sci. |
2010 |
DBLP DOI BibTeX RDF |
|
35 | Wisut Supithak, Surya Danusaputro Liman, Elliot J. Montes |
Lot-sizing and scheduling problem with earliness tardiness and setup penalties. |
Comput. Ind. Eng. |
2010 |
DBLP DOI BibTeX RDF |
|
35 | Francis Sourd |
New Exact Algorithms for One-Machine Earliness-Tardiness Scheduling. |
INFORMS J. Comput. |
2009 |
DBLP DOI BibTeX RDF |
|
35 | Mehmet Duran Toksari, Ertan Güner |
Parallel machine earliness/tardiness scheduling problem under the effects of position based learning and linear/nonlinear deterioration. |
Comput. Oper. Res. |
2009 |
DBLP DOI BibTeX RDF |
|
35 | Nina Runge, Francis Sourd |
A new model for the preemptive earliness-tardiness scheduling problem. |
Comput. Oper. Res. |
2009 |
DBLP DOI BibTeX RDF |
|
35 | Le Thi Hoai An, Nguyen Quang Thuan, Nguyen Huynh Tuong, Pham Dinh Tao |
A time-indexed formulation of earliness tardiness scheduling via DC programming and DCA. |
IMCSIT |
2009 |
DBLP DOI BibTeX RDF |
|
35 | Dvir Shabtay |
Due date assignments and scheduling a single machine with a general earliness/tardiness cost function. |
Comput. Oper. Res. |
2008 |
DBLP DOI BibTeX RDF |
|
35 | Chung-Lun Li, Gur Mosheiov, Uri Yovel |
An efficient algorithm for minimizing earliness, tardiness, and due-date costs for equal-sized jobs. |
Comput. Oper. Res. |
2008 |
DBLP DOI BibTeX RDF |
|
35 | Yasmín Á. Ríos-Solís |
Scheduling with earliness-tardiness penalties and parallel machines. |
4OR |
2008 |
DBLP DOI BibTeX RDF |
MSC classification (2000) 90B35, 90C27, 90C59, 90C20, 90C39 |
35 | Safia Kedad-Sidhoum, Yasmín Á. Ríos-Solís, Francis Sourd |
Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates. |
Eur. J. Oper. Res. |
2008 |
DBLP DOI BibTeX RDF |
|
35 | Kuo-Ching Ying |
Minimizing earliness-tardiness penalties for common due date single-machine scheduling problems by a recovering beam search algorithm. |
Comput. Ind. Eng. |
2008 |
DBLP DOI BibTeX RDF |
|
35 | Marcin Bazyluk, Leszek Koszalka, Keith J. Burnham |
Parallel Machine Earliness-tardiness Scheduling - Comparison of Two Metaheuristic Approaches. |
ICINCO-ICSO |
2008 |
DBLP BibTeX RDF |
|
35 | Yann Hendel, Francis Sourd |
An improved earliness-tardiness timing algorithm. |
Comput. Oper. Res. |
2007 |
DBLP DOI BibTeX RDF |
|
35 | Lars Mönch, Robert Unbehaun |
Decomposition heuristics for minimizing earliness-tardiness on parallel burn-in ovens with a common due date. |
Comput. Oper. Res. |
2007 |
DBLP DOI BibTeX RDF |
|
35 | Mehdi Iranpoor, Seyyed M. T. Fatemi Ghomi, A. Mohamadinia |
Earliness tardiness production planning and scheduling in flexible flowshop systems under finite planning horizon. |
Appl. Math. Comput. |
2007 |
DBLP DOI BibTeX RDF |
|
35 | Gur Mosheiov, Daniel Oron |
Minmax scheduling with job-classes and earliness-tardiness costs. |
Eur. J. Oper. Res. |
2007 |
DBLP DOI BibTeX RDF |
|
35 | Shih-Wei Lin, Shuo-Yan Chou, Kuo-Ching Ying |
A sequential exchange approach for minimizing earliness-tardiness penalties of single-machine scheduling with a common due date. |
Eur. J. Oper. Res. |
2007 |
DBLP DOI BibTeX RDF |
|
35 | Aiqing Yu, Xingsheng Gu |
Application of Cultural Algorithms to Earliness/Tardiness Flow Shop With Uncertain Processing Time. |
ICNC (4) |
2007 |
DBLP DOI BibTeX RDF |
|
35 | Jakub Bauman, Joanna Józefowska |
Minimizing the earliness-tardiness costs on a single machine. |
Comput. Oper. Res. |
2006 |
DBLP DOI BibTeX RDF |
|
35 | Mohamed K. Omar, Siew-Chein Teo |
Minimizing the sum of earliness/tardiness in identical parallel machines schedule with incompatible job families: An improved MIP approach. |
Appl. Math. Comput. |
2006 |
DBLP DOI BibTeX RDF |
|
35 | Francis Sourd |
Dynasearch for the earliness-tardiness scheduling problem with release dates and setup constraints. |
Oper. Res. Lett. |
2006 |
DBLP DOI BibTeX RDF |
|
35 | Yann Hendel, Francis Sourd |
Efficient neighborhood search for the one-machine earliness-tardiness scheduling problem. |
Eur. J. Oper. Res. |
2006 |
DBLP DOI BibTeX RDF |
|
35 | Gur Mosheiov, Uri Yovel |
Minimizing weighted earliness-tardiness and due-date cost with unit processing-time jobs. |
Eur. J. Oper. Res. |
2006 |
DBLP DOI BibTeX RDF |
|
35 | Lei Li, Daniel J. Fonseca, Der-San Chen |
Earliness-tardiness production planning for just-in-time manufacturing: A unifying approach by goal programming. |
Eur. J. Oper. Res. |
2006 |
DBLP DOI BibTeX RDF |
|
35 | Refael Hassin, Mati Shani |
Machine scheduling with earliness, tardiness and non-execution penalties. |
Comput. Oper. Res. |
2005 |
DBLP DOI BibTeX RDF |
|
35 | Francis Sourd |
Earliness-tardiness scheduling with setup considerations. |
Comput. Oper. Res. |
2005 |
DBLP DOI BibTeX RDF |
|
35 | Yunpeng Pan, Leyuan Shi, Hoksung Yau |
A new optimization approach to the general single machine earliness-tardiness problem. |
CASE |
2005 |
DBLP DOI BibTeX RDF |
|
35 | Rasika H. Suriyaarachchi, Andrew Wirth |
Earliness/tardiness scheduling with a common due date and family setups. |
Comput. Ind. Eng. |
2004 |
DBLP DOI BibTeX RDF |
|
35 | Amit Kumar Gupta, Appa Iyer Sivakumar, Viswanath Kumar Ganesan |
Look ahead batching to minimize earliness/tardiness measures in batch processes. |
RAM |
2004 |
DBLP DOI BibTeX RDF |
|
35 | Jose A. Ventura, Daecheol Kim |
Parallel machine scheduling with earliness-tardiness penalties and additional resource constraints. |
Comput. Oper. Res. |
2003 |
DBLP DOI BibTeX RDF |
|
35 | Gur Mosheiov |
Due-date assignment with asymmetric earliness-tardiness cost. |
J. Oper. Res. Soc. |
2003 |
DBLP DOI BibTeX RDF |
|
35 | Yang Yi, Dingwei Wang |
Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines. |
J. Intell. Manuf. |
2003 |
DBLP DOI BibTeX RDF |
|
35 | Shunji Tanaka, Taku Sasaki, Mituhiko Araki |
A branch-and-bound algorithm for the single-machine weighted earliness-tardiness scheduling problem with job independent weights. |
SMC |
2003 |
DBLP DOI BibTeX RDF |
|
35 | Jose A. Ventura, Daecheol Kim, Frederic Garriga |
Single machine earliness-tardiness scheduling with resource-dependent release dates. |
Eur. J. Oper. Res. |
2002 |
DBLP DOI BibTeX RDF |
|
35 | Guohua Wan, Benjamin P.-C. Yen |
Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties. |
Eur. J. Oper. Res. |
2002 |
DBLP DOI BibTeX RDF |
|
35 | Daniel Pandolfi, G. Vilanova, Maria E. De San Pedro, Andrea Villagra, Raúl Héctor Gallard |
Studs Mating Immigrants in Evolutionary Algorithm to Solve the Earliness-Tardiness Scheduling Problem. |
Cybern. Syst. |
2002 |
DBLP DOI BibTeX RDF |
|
35 | Mario Vanhoucke, Erik Demeulemeester, Willy Herroelen |
An Exact Procedure for the Resource-Constrained Weighted Earliness-Tardiness Project Scheduling Problem. |
Ann. Oper. Res. |
2001 |
DBLP DOI BibTeX RDF |
weighted earliness-tardinesss costs, branch-and-bound, resource-constrained project scheduling |
35 | Sakib A. Mondal, Anup K. Sen |
Single machine weighted earliness-tardiness penalty problem with a common due date. |
Comput. Oper. Res. |
2001 |
DBLP DOI BibTeX RDF |
|
35 | C. S. Sung, J. I. Min |
Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date. |
Eur. J. Oper. Res. |
2001 |
DBLP DOI BibTeX RDF |
|